Licensed crypto-mining host 💧 Hydro-powered 📍 United Arab Emirates
Turnkey · Hosting · Mining

Own a Bitcoin mine in the UAE. Fully built, fully run.

A turnkey 5,100 kW hydro-powered Bitcoin mining facility on a 10-year licensed hosting contract. Power locked in from $0.035/kWh. Base-case break-even inside 19 months. You provide capital, you own the BTC. We do everything else.

Replies within minutes · No obligation · Full financial model shared on request

Facility snapshot● ALLOCATING

Build-out (~$3.27M)
Usable hydro load
$0.035/kWh
Locked power, Yr 1 to 2
Licensed host contract
Base-case break-even
+262%
48-mo HODL return
6 MVA · 6-month buildSingle allocation open
Licensed host · valid UAE crypto-mining permit
Hydro power · low, fixed energy cost
Turnkey · build, deploy, operate, report
Speed to cash · mining from month 1
The opportunity

The rare combination: cheap energy and speed to cash

AED 12M secures a 10-year hosting agreement with a Sheikh-owned company holding a valid crypto-mining licence, supplying power at a contractually fixed rate. You populate the 5,100 kW load with next-generation hydro miners and earn Bitcoin from day one.

Power that stays cheap

Hydro electricity at a contractually fixed $0.035/kWh for years 1 to 2, then $0.05/kWh. Energy is the single biggest cost in mining, so a locked-in rate is your durable edge over grid-exposed competitors.

Regulated, licensed host

The site is operated by a licensed UAE entity, so you sidestep the permitting, compliance and grid-access hurdles that stall most mining projects. A regulated counterparty, not a back-room setup.

Genuinely turnkey

We handle licence, build, cooling, miner procurement, deployment and 24/7 operations. The 6-month build runs at 20% on signing and 80% on letter of delivery and notice. You own every Bitcoin the fleet mines.

Inside the facility

Bitmain hydro hardware, end to end

5,100 kW of Bitmain Antminer Hydro miners deployed in Antspace HK3 liquid-cooling containers. Closed-loop hydro cooling runs the fleet denser, quieter and longer-lived than air-cooled rigs, ideal for the UAE climate.

The numbers

What your capital does over 48 months

Two hardware options, two exit strategies. Pick how you want to play it. Base case: BTC starts at $62,250, +4%/mo in years 1 to 3, difficulty tracking price.

Option A

1,005 × S21+ Hyd
338 TH/s each · 339,690 TH/s fleet · 5,095 kW
+242% ROI over 48 months
break-even month 19
Upfront investment$5.88M
  in dirhamsAED 21.6M
BTC mined (48 mo)116 BTC
BTC stack retained64.5 BTC
Stack value, month 48$20.1M
Discuss Option A
48-month value growth, HODL strategy
Portfolio value of retained BTC, valued at market
Option B · $33.3M Option A · $20.1M

HODL = retain mined BTC, selling only enough to cover hosting, valued at the month-48 price. Sell = convert all mined BTC to cash monthly. ROI = profit divided by upfront cash. Illustrative projection, not financial advice.

How it works

From signature to first Bitcoin in six months

A defined path with milestone-based payments. No guesswork, no operational burden on you.

Reserve capacity

Secure your slice of the 5,100 kW allocation and lock the hosting terms. 20% on signing.

We build & equip

Site fit-out, power, cooling and miner procurement over a 6-month window. 80% on delivery and notice.

Deploy & energize

Your ASIC fleet is racked, configured and pointed at the pool. Hashing begins from month one.

Earn & report

BTC mined is yours, retained or sold monthly. Transparent reporting on uptime, output and costs.

Strategic optionality

A 10-year asset, modelled on just the first 4

The contract runs a full decade, but the returns above assume only four years. That leaves six further years of contracted, low-cost hydro capacity, and a built-in pivot.

  • Downside protected by Bitcoin economics. Cheap, fixed power keeps you profitable across market cycles.
  • Upside extended by the AI pivot. At the year-4 hardware refresh, the same cooled, licensed, grid-connected site can host AI and HPC compute, a higher-value use of power.
  • You own a flexible energy-to-compute asset, not just a rack of miners.
10-year hosting horizon
Bitcoin miningYears 1 to 4 · this model
Mining or AI / HPC computeYears 5 to 10 · site re-purposable
Y0 signedY4 inflection ↑Y10 end

Year 4 is the natural decision point: refresh the mining hardware, or convert capacity to AI inference as MENA data-centre demand accelerates. Either way, the cheap power keeps working for you.

Questions

What investors ask first

Is Bitcoin mining legal in the UAE?+
Yes. The facility operates through a Sheikh-owned company that holds a valid crypto-mining licence, with power supplied under a regulated 10-year hosting contract. You invest into a licensed, compliant structure.
How much capital do I need to start?+
The site build-out is AED 12M (about $3.27M). Total upfront, including the miner fleet, is $5.88M for Option A (S21+ Hyd) or $9.20M for the higher-yield Option B (S21 XP+ Hyd). We can walk you through the full line-by-line model on WhatsApp.
What return should I expect?+
In the base case, the HODL strategy reaches break-even inside 19 months, with a 48-month return of +242% (Option A) to +262% (Option B). The sell-monthly strategy is more conservative at +24% to +37%. All figures depend on the Bitcoin price and network difficulty and are illustrative, not a guarantee.
Why mine in the UAE specifically?+
Three reasons: a low, contractually fixed hydro power cost of $0.035/kWh; a regulated, licensed host that removes compliance and grid-access risk; and a stable, business-friendly jurisdiction with a clear path to scale. Cheap, locked-in power is the number-one driver of mining profitability.
What exactly is turnkey here?+
Everything operational. We handle the licence, the build, power and cooling, miner procurement and deployment, and 24/7 operations and reporting. You provide the capital and own the Bitcoin the fleet produces.
What happens after year 4?+
The contract runs 10 years. At year 4, the natural hardware-refresh point, you can re-deploy fresh miners or pivot the same cooled, licensed, grid-connected site to AI and HPC compute, a higher-value use of the power as data-centre demand grows.
One 5,100 kW allocation currently open

Ready to own a Bitcoin mine in the UAE?

Message us on WhatsApp and we will send the full 48-month financial model, hardware options and contract terms. No obligation.

Chat on WhatsApp: +971 54 322 9975
Typical reply in minutes · Full model shared on request · Speak directly with the operator
Chat with us